Wastewater Treatment Plants 1, 2, 9 &12, MCB Camp Pendleton
STP
KAL Architects provided two (2) Request for Proposals for two (2) Design-Build packages for the repair and modification of four (4) Sewage Treatment Plants. This project included repairs/modifications of Sewage Treatment Plants (STP) 1, 2, 9 and 12; Collection Systems Tributary Areas 1, 2, 9 and 12; and the modification of a Pump Station. Some of the obstacles that our team had to overcome included, lack of as-built information, age of the facilities, limited project budgets, and several environmental issues.
Key Project Features:

  • Sewer Disposal System Project
  • Scope included engineering studies, reports, evaluations, Drawings generated in AutoCAD, cost estimates and specifications
  • U.S. Navy Project
  • Civil Engineering Design Services included erosion control, site drainage, roadways and parking, retaining wall, topographic studies, geotechnical and environmental studies, sanitary sewer, storm drainage and water distribution among other

© Copyright 1999-2010 KAL Architects, Inc.. All Rights Reserved.For Site related questions and Technical support please email webmaster@kalarchitects.com